Water Treatment Plant, Sjölunda, Malmö Sweden

Dry Sludge Silo 250m3 with discharge equipment

PLANT REPORT SAX 1260

Download as pdf

Saxwerk delivered in 2020 one new dry sludge silo for the water treatment plant, Sjölunda in Malmö Sweden.

Saxwerk has delivered, installed and commissioning one sludge silo consisting of a steel silo, sliding frame, 2 x discharge screw type DA. The system unload sludge to a lorry outside the silo.

Technical data:
Material: Dry sludge
Capacity: 2 x 60 m3/h
Diameter: 5 500 mm
Casing Height: 10 600 mm
Support Height: 6 200 mm
Volume: 250 m3