Water Treatment Plant, Häggesta, Bollnäs, Sweden

Dry Sludge Silo 100 m3 with discharge equipment.

PLANT REPORT SAX 877

Download as pdf

Saxwerk delivered in 2017 one new dry sludge silo for the water treatment plant, Häggesta in Bollnäs Sweden.

Saxwerk has delivered, installed and commissioning one sludge silo consisting of a steel silo, sliding frame, discharge screw type DA. The system unload sludge to a lorry outside the silo.

Technical data:
Material: Dry sludge
Capacity: 80 m3/h
Diameter: 4 000 mm
Casing Height: 8 000 mm
Support Height: 5 500 mm
Volume: 100 m3