Biogas Plant, Bergen, Norway
Dry Sludge reception bins 2 x 138 m3 with discharge equipment.
PLANT REPORT SAX 592-1
Saxwerk delivered in 2015 two new dry sludge reception bins for the Biogas plant, in Bergen, Norway.
Saxwerk has delivered, installed and commissioning two sludge bins consisting of a concrete bin, hydraulic hatch, push floor and discharge screw. The system fills up with a lorry.
Technical data: | |
---|---|
Material: | Dry sludge |
Capacity: | 2 x 5 m3/h |
Width: | 4 000 mm |
Length: | 5 000 mm |
Height: | 6 500 mm |
Volume: | 2 x 138 m3 |