Västervik Miljö & Energi AB, Västervik, Sweden

Reception bin 480 m3 for a CHP plant

PLANT REPORT SAX 579

Download as pdf

 

Saxwerk delivered in 2014 a new reception bin for Västervik Miljö & Energi at their facility in Västervik, Sweden.

Saxwerk has delivered, installed and commissioning a fuel reception bin consisting of a push floor, levelling screw, belt conveyor with magnet separator that feeds fuel into existing storage.

Technical data:  
Material: Shredded Garbage
Capacity: 200 m3/h
Lenght: 14 500 mm
Width:
6 000 mm
Height: 5 500 mm
Volume: 480 m3