Fuel handling system for a Energy plant

PLANT REPORT SAX 852

Download as pdf

 

Saxwerk delivered in 2016 a fuel handling system for a 8MW hot water boiler to a saw mill in Sweden.

Saxwerk has delivered, installed and commissioning a push floor with levellling screw. And a scraper conveyor, that feeds fuel from storage into boiler infeeder.

Technical data:
Material: Wood chips, sawdust, bark
Capacity: 30 m3/h
Length: 12 000 mm
Width:
9 000 mm
Height: 4 000 mm
Volume: 400 m3